SUMMARY BASED ON STATED ASSUMPTIONS
Chicken density
/m²
(Trial was 18.5-19.3)
Existing mortality
(Trial was 12.4% - 15.5%)
Improvement
(Trial was 10.6% to 18.6%)
Revised mortality
Status quo Kg/hd
Weight increase (%)
Chicken $/kg
Save
* This density is at finished average kg but 75% through the cycle in relation to (revised) deaths.
In NZ, the MPI maximum is 38kg per m².
Consider finishing timeframe benefit
Standard cycle
days
Changeover
days
Zoono® days
days
Save
Business case for application charge
This analysis considers the charge based on a user-definable factor in relation to the calculated benefits.
Cost benefit factor
times
""
NOTE:
This does does take account of the changeover time saving.
Save
Analysis of suggested charge
Charge per Sq m
""
New shed (
example
)
m²
m perimeter
Wall height
m
Total wall area
Total cost
Cost per m² of wall
/m²
Save